Skip to content

01Engineering specializations

Tier III data center design

Mission-critical data center design | 0.5 MW – 5 MW

Data centers designed to Tier III requirements — concurrently maintainable, with redundant power and cooling paths — from 0.5 to 5 MW. I lead the integrated design process and take part in technical review and approval, coordinating the specialist engineers of every discipline.

PATH APATH BUtility supplyGenerators N+1G1 · G2 · G3MV switchgearTransformerATransformerBATSATSUPS (N+1)AUPS (N+1)BPDUAPDUBIT load — dual-cordedPrecision cooling N+1CRAH 1 · CRAH 2 · CRAH 3 (N+1)BMS · DCIM — monitoring & control
Illustrative concept based on Tier III requirements: independent A/B power paths, N+1 redundancy and concurrent maintainability — any component on one path can be maintained while the other carries the load. Not an Uptime Institute–certified design.

Technical scope

  • 01Electrical power architecture — utility, MV/LV distribution, protection coordination
  • 02UPS, generators and PDUs on independent A/B paths
  • 03Mechanical — precision cooling, chilled water, airflow and thermal management
  • 04Fire detection & suppression
  • 05ICT, network and structured cabling infrastructure
  • 06Physical security
  • 07BMS & DCIM
  • 08Architectural & structural coordination

Design & consultancy capabilities

  • Integrated design leadership
  • Redundancy and concurrent-maintainability review
  • Multidisciplinary coordination from tender to handover
  • Technical design review and participation in approvals
  • Technical and commercial proposals

Project references

12 related projects

The project, its full scope and its contract belong to the delivering group company. This page describes my role within it.

Next specialization

Integrated MEP & ICT infrastructure